来自E2A的分享。他们在瑞斯苏黎世的郊区完成了一栋追求视野最大化,并带有斜面的高层公寓。在欧洲,因为旧城保护措施,这样的新建筑不得不位于郊区。因此,全景图从来都不属于这种大环境下的城市规划的一部分。在这里,在这个项目中,建筑师的大都会梦想终于可以实现,也终于可以尽情发挥。城市必须消耗土地,建筑师将带有露台的房屋堆叠而成为城市大“高层”。
Escher Terraces High-Rise Apartments,Zurich, 2007-2013
Terraced housing refers to the countlesssuburban proposals seeking to maximize views with their slopes. Surprisingly,these proposals are often far removed from an uncompromising belief in thecity. They line the outskirts of urban configurations, jostling to assert themselves.In our cities, views and panoramas are not part of an urban agenda. Our “dreammetropolis” is and will remain part of the small-city typology. As a result, wepossess no metropolitan inheritance, no local references on which to lean.
It seems that an exhaustion of theperiphery must occur in order to reach the point when the city center willattempt to develop and construct truly urban typologies.
We transport the terrace from theperiphery back into the city. We stack them into a large urban residence.
这栋高楼与现存于埃舍尔-怀斯工业区边缘的新颖仓库融为一体,很难被人们注意到,这种情况在苏黎世可不常见。剧院的排练舞台与现有建筑物融合,过往的工业遗迹以鲜活的状态留存。新建筑与原有建筑融为一体,多孔性材料从里面填充了原本的拱形窗户,使之成为一个全新的整体。这栋建筑因加入了现有的工业元素,并且离街道稍远而呈现出城市中不常见的模样。
The tower merges with the existing,original warehouse that stands on the edge of the Escher-Wyss industrial area,abandoned and hidden – a situation unusual to Zurich. Rehearsal stages for theopera house will be integrated with the existing buildings to create a linkwith the surrounding industrial production, still active today. The newconstruction absorbs the existing, infusing it with a porous materiality. Itfills the old arched windows from the inside, and as such is converted into anew whole. By weaving the existing industrial elements with the residentialtower, the building engages with an unusual urban situation, standing slightlyoffset from the street.
这栋建筑的轮廓呈现出锥形。现有结构高25米,再向上便是每8米一单元堆叠起来的新公寓。朝南的看台一直上升至60米处,从这里看到从苏黎世湖直至市中心的广阔风景。
The profile of the building developsconically. From the upper edge of the existing structure, with a depth of 25meters, the new apartments of 8 meter modules stack continuously upwards. Asouth-facing tribune rises to a height of 60 meters and reveals an expansiveview over the city center and Lake Zurich.
Client:
Allreal West AG, Zurich
Realization:
2011 – 2014
Team:
Wim Eckert, Piet Eckert with Nils Döringand Anna Maria Tosi, Sabine Bayer, Samuel Benz, Daniel Bock, Vesna Brandestini,Carolin Döpfer, Christian Dürr, Cristina Gonzalo Nogués, Bryan Graf, PhilippHeidemann, Harris Iliadis, Aidan Kümmerli, Valentino Sandri, Mireya SanchezGomez, Alexander Struck
Collaboration:
Artistic Collaboration: Hans-PeterKistler, Beinwil
General Contractor: AllrealGeneralunternehmung AG, Zurich
Structural Engineering: JägerPartner AGBauingenieure SIA, Zurich
Landscape Consulting: SchmidLandschaftsarchitekten GmbH, Zurich
Façade Engineering: Atelier P3 AG, Zurich
Building Physics: Buri Bauphysik &Akustik, Volketswil
MEP: Troxler & Partner AG, Ruswil
Photographs: Georg Aerni, Zurich; JanBitter, Berlin; Radek Brunecky, Zurich; Rasmus Norlander, Zurich; Jon Naiman,Biel
via:gooood.hk