Text description provided by the architects. In Romanshorn, a small town located at the Lake Constance in Switzerland, a centrally located educational, sports and leisure campus is developing. At its entrance one finds the building complex of the secondary school. The new construction replaces two outdated buildings and links future and past developments. Together with an existing building from the year 2000 it forms a spatial and functional unit, while a new gallery along the entrance façade creates a connection with the existing building positioned on the opposite side. Its compact design and orientation leave room for future developments at the campus entrance, occupying a minimal footprint of the site being made available by the client.
In the centre of the building are the Salão (hall) and the Patio (inner courtyard). They form the literal core of the building. These central rooms are enclosed by the all-round corridors, which are directed inwards and promote visual contact within the building. All other rooms, such as classrooms and group rooms, are directed outwards to the surrounding campus area.
The building is vertically accessed by a centrally located open staircase and two diametrically opposed emergency staircases in the corners of the building. The latter allow the corridors to be designed as recreation and movement areas with free use, as they do not have to be designed as escape routes. Light shafts over two storeys also provide visual relationships here and bring daylight from the dominant shed roof into the building.
The main entrance is in the direction of the Pausenhof. The roofing in this area offers a weather-protected outdoor space along the entire façade to the courtyard. Another entrance is to the north towards the Mensa building and to the west towards a playground, allowing for several accesses to the building.
The internal materialisation emphasises the three room zones of the building: core zone, movement zone and classroom or group room. The central Salão is the "living room" of the building. Its preferred location, the flexible and open use and the design with pleasant wooden surfaces make it the backbone of the school's character. The most heavily stressed movement zone is mineralised. The wall surfaces are exposed concrete, the floor is pigmented hard concrete. The classrooms are based on the term "Schulstube" and are classically materialised with white plaster surfaces and pinna-able cabinet fronts.
The external appearance of the new building is mediated on the one hand by the proportions and structure between the surrounding existing buildings. At the same time, the building seeks to find its independence in a mixed environment through its materialisation with ceramic slabs and prefabricated glass fibre concrete elements.
建筑设计:Architekturbüro Bernhard Maurer GmbH, Bak Gordon Arquitectos
地点:瑞士
类型:中小学
面积:4975.0平方英尺
年份:2019年
摄影:Rasmus Norlander
协调方:Nuno Costa, Eleonora Bassi
合作方:Catarina Farinha, Frederic Garrigues, Maria Barreiros, Stefano Farina
客户:Sekundarschulgemeinde Romanshorn-Salmsach
施工管理:Bischof Partner Architektur AG
基础与结构:Frick+Gattinger AG
水利机械:Gianotti AG
电子交流:IBG GRAF AG Engineering
安全管理:Josef Kolb AG, Ingenieure & Planer
建筑物理:Bakus Bauphysik + Akustik GmbH
景观设计:Pauli | Stricker GmbH Landschaftsarchitekten BSLA
艺术策略:Rachel Lumsden
翻新区域:13777.81平方英尺(约1280平方米)
施工成本:14 560 000 瑞士法郎 (BKP 2 Erstellungskosten)
总成本:17 840 000瑞士法郎 (BKP 1-9 Gesamte Erstellungskosten)
能量标准:Minergie Standard
Architects: Architekturbüro Bernhard Maurer GmbH, Bak Gordon Arquitectos
Location: Romanshorn, Switzerland
Category: Elementary & Middle School
Area: 4975.0 ft2
Year: 2019
Photographs: Rasmus Norlander
Coordinary: Nuno Costa, Eleonora Bassi
Collaboration: Catarina Farinha, Frederic Garrigues, Maria Barreiros, Stefano Farina
Client: Sekundarschulgemeinde Romanshorn-Salmsach
Construction Management: Bischof Partner Architektur AG
Foundations and Structures: Frick+Gattinger AG
Hydraulics and Mechanics: Gianotti AG
Electrics and Communications: IBG GRAF AG Engineering
Segurança: Josef Kolb AG, Ingenieure & Planer
Building Physics: Bakus Bauphysik + Akustik GmbH
Landscape: Pauli | Stricker GmbH Landschaftsarchitekten BSLA
Art Intervention: Rachel Lumsden
Refurbishment Area: 13777.81 ft2
Construction Cost: 14 560 000 CHF (BKP 2 Erstellungskosten)
Total Cost: 17 840 000 CHF (BKP 1-9 Gesamte Erstellungskosten)
Energy Standard: Minergie Standard