由专筑网邱媚,Vigo编译
来自事务所的描述。PSD Bank RheinNeckarSaar eG是在萨尔布吕肯中心的一个高级银行,同时也是一栋行政楼。在竞标中,12个有名的事务所受邀参与,接受由专家组成的独立裁判团评估。脱颖而出的是来自Kaiserslautern 市的Bayer & Strobel Architekten。
From the architect. PSD Bank RheinNeckarSaar eG has built a novel Banking and Administration facility at a central position (Bahnhofstraße/ corner Sulzbachstraße) in Saarbrücken. Within the scope of a design competition , that 12 renowned architectural firms were invited to enter, have been evaluated by an independent jury of experts. The winning architecture office was Bayer & Strobel Architekten from Kaiserslautern.
© Peter Strobel
设计要求十分复杂,一方面作为小型建筑要符合城市建筑标准,另一方面,作为当代银行和行政设施所需要的功能需求也要在合理成本下得以实现。设备还要能代表银行在公众中的形象,同时要在Saarbrücken市中心给人留下深刻映像。
The requirements were highly complex, as on the one hand the building needed to meet certain urbanistic criteria as a corner building and on the other hand the demands in terms of functionality of a contemporary Banking and Administration facility had to be realized in a cost-effective fashion. Moreover, the facility should represent the self-image of the bank in public while creating a striking impression in the center of Saarbrücken.
© Peter Strobel
周边环境
战后修建的两层建筑成为新建筑的一部分。邻近建筑的檐高和城市发展需要被纳入考虑。相似地,Bahnhofsstraße设计核心元素——石柱廊被采纳,因此主入口也定在了这里。
锯齿状柱子灵活地适应了Sulzbachstraße,105个钻孔灌桩应用在新建筑中,作为邻近建筑的一种安保措施,巨大的管同时也是Bahnhofsstraße的石柱廊。Sulzbach地下枢纽的开挖建设离PSD银行不远,需要特别注意。
Context
A building consisting of only two storey constructed in the post war period gave way to the new construction. As regards urban development the eaves height of the neighbouring building was carried over around the corner. Similarly, the colonnade as a central element of design of the Bahnhofsstraße was adopted, hence the main entrance is located there.
The indented pillar builds a smart transition to the Sulzbachstraße. 105 bored piles were needed in order to ground the new construction respectively to secure the neighbouring buildings as well as numerous pipes that proceed along the colonnades of the Bahnhofsstraße. In addition, the canalization construction of the subterranean transferred Sulzbach adjoins the PSD-Bank property that needed to be addressed.
© Peter Strobel
外立面
统一的外观被简化为天然石材的结构网格,对外是一致的一排灰色背底的窗户。两个外立面设计都插入一层高的方格窗口。
Facade
The uniform facades are reduced to a structured grid of natural stone, filled with evenly spaced rows of windows with grey surrounds which represents the constructive pattern outwards. All two facades are punctuated by an regular grid of openings that occupy the full height of each storey.
© Peter Strobel
银行疏水处统一的材料(Gauinger Travertin)与统一上釉的外观有别。单个百叶窗元素和上釉玻璃达成转换。外观获得深度和柔软性,在室内特别是办公室也能看得到。游客能从窗口进入,让玻璃外观看起来与众不同。
The therefore utilized material (Gauinger Travertin) stem from the catchment area of the bank and build a lively contrast to the smooth facade-aligned fixed glazing. These alternate within a single window element with opening wings and inclined adjusted fixed glazing. Hence the facade receives depth and plasticity which is also clearly noticeable in the interior, especially in the offices. Thus the visitor can enter the window and the inclined glazing enables an unusual outlook.
© Peter Strobel
巨大的玻璃能提供最佳的日光照射效果,保障内外景观。钢框窗的应用让顶端的宽度变小。内部带防晒保护的三层日光调节玻璃可以即刻反射热能,阻止热量流失。
The large glazing serves the optimal use of daylight and guarantees generous in/-outside views. The application of steel-made window profiles allows narrow elevation widths. The summery heat protection is ensured by triple solar control glazing combined with an internally located sun protection having a high degree of reflection immediately behind.
© Peter Strobel
内装
内部的中心元素由涵盖四层的巨大前厅构成。邻近的走廊和展厅,不仅是通道,还能在其中进行交流。各种会议和活动的使用功能都得到恰当的考虑。中庭可用于举办展览,摇身一变成艺术馆。中庭最近布置了来自Stuttgart的纪录片艺术家Volker W. Hamann的作品展览。接待处家具出于空间灵活性的想法可移动。接待客人咨询的办公室与前厅直接相连,在建筑内部创造了一个明亮开放的地方——通过玻璃走廊。
Interior
A central element of the interior consists of a spatially stretched foyer which covers a height of four floor. The adjoining corridors and galleries not only represent means of accessibility but rather places of encounter and communication. Diverse usage for the sake of events and activity are conceivable and receive an suitable limits. Alternating exhibitions transform the atrium to an art gallery. Currently, the atrium benefits from the installation of a video artist named Volker W. Hamann from Stuttgart. The reception furniture possess a mobile design in order to ensure highest flexibility within this area. The offices for customer consulting can be accessed directly from the foyer which create a bright and open atmosphere in the interior of the building – by means of corridor walls made of glass. The actual waiting.
© Peter Strobel
PSD银行接待客人的新办公厅在二楼石柱廊之上。外观上中庭像一个附着在外墙上的步入式双层城市阳台。室内开放的环境由被其选材所支撑(玻璃墙,石灰石地板),与后方墙和楼梯采用的黑色单板(诺瓦尔橡色)产生视觉碰撞。24小时开放的自主提款机由玻璃墙隔开。五层和六层全部是办公地方,一个复式的会议室直通屋顶,能看到Saarbrücken的美景。
PSD Bank RheinNeckarSaar eG / New Office Building Saarbrücken/Germany area for customers are located in the second floor above the colonnade. From the exterior the foyer appeals as a (walkable) two-storied city-balcony in the facade. The open atmosphere in the interior is supported by the choice of material (bright walls, Jura limestone-stone floor), however contrasted by a few dark fittings as rear wall or stairways in significant black stained black furnier (oak noir). The 24 hours area with cash machine can be detached by a glass lifting wall (retractable in ground). The 5th and 6th storeys are pure office storeys, a conference room is located in the staggered floor with access to the roof-terrace and an impressive view of the city center of Saarbrücken.
© Peter Strobel
Section 2/剖面图2
总的来说,大楼体现了银行的特色,既开放透明,又坚固牢靠。
In total the building reflects the self-image of the bank which on the one hand is coined by openness and transparency and on the other hand by solidity and bindingness.
© Peter Strobel
© Peter Strobel
© Peter Strobel
Site Plan/总平面图
Second Floor Plan/二层平面图
Section 1/剖面图1
Third Floor Plan/三层平面图
First Floor Plan/一层平面图
Ground Floor Plan/底层平面图
事务所: Bayer & Strobel Architekten
地点: 德国萨尔布吕肯
负责人: Gunther Bayer, Peter Strobel
面积: 1610.0 平米
年份: 2015
摄影师: Peter Strobel
结构工程师: Lederer Ingenieure
建筑服务: IPTG EGGERICHS Sankt Wendel
能源策略: Müller-BBM GmbH
照明: Henn-PlanungsWerkstatt
艺术设计: Volker W. Hamann, Stuttgart
Architects: Bayer & Strobel Architekten
Location: Bahnhofstraße 68, 66125 Saarbrücken, Germany
Architects In Charge: Gunther Bayer, Peter Strobel
Area: 1610.0 sqm
Year: 2015
Photographs: Peter Strobel
Structural Engineer: Lederer Ingenieure
Building Services Engineering: IPTG EGGERICHS Sankt Wendel
Energy Strategy: Müller-BBM GmbH
Illumination: Henn-PlanungsWerkstatt
Art: Volker W. Hamann, Stuttgart
出处:本文译自www.archdaily.com/,转载请注明出处。
|
|
专于设计,筑就未来
无论您身在何方;无论您作品规模大小;无论您是否已在设计等相关领域小有名气;无论您是否已成功求学、步入职业设计师队伍;只要你有想法、有创意、有能力,专筑网都愿为您提供一个展示自己的舞台
投稿邮箱:submit@iarch.cn 如何向专筑投稿?