由专筑网邱媚编译
来自设计师的描述:布鲁塞尔环保局是致力于管理比利时首都环境和生态的政府机构,最近落址在首都附近最大和最重要的城市改造区之一——Havenlaan的Tour&Taxis基地。考虑到规划的持续性,本项目成为国内、国际的启发性案例。
From the architect. Brussels Environment is the government authority in the field of environment and habitat in the Belgian Capital Region and has recently settled in one of the capital’s largest and most important urban renewal districts, the Tour&Taxis site on the Havenlaan. Given that the organ issues ambitious guidelines for sustainability, its own quarters function as an edifying national and international example.
© cepezed | Léon van Woerkom
建筑最大的特色是其紧凑的体量,内部带楼层步梯,顶上覆盖大面积透明圆形天花。中庭作为临近广场的延伸区域,该区域包括大型皇家航站及站台的历史建筑,最近被改建后容纳了办公室、餐馆、设计品商店及文化活动等功能。最低两层包括一个生态主题的游客中心、一个礼堂、一个多媒体图书馆、一个会议中心和一个餐馆。建筑三层以上是内部安排灵活的多样办公环境,位于公共区域之上。在三楼有供布鲁塞尔环境部进行与其业务相关测试的实验室。在显眼处,一条长长的步梯连接开放展区,鼓励人们放弃电梯选择步行。
The building is characterized by a compact volume with stepped receding floor slabs under a rounded and largely transparent roof. A central atrium functions as a continuation of the adjacent square, which includes the large-scale historical buildings of the Royal Depot and the Sheds, which were recently renovated and now house offices, restaurants, design retail and cultural events. The two lowest storeys contain a visitors’ centre with ecological themes, an auditorium, a multimedia library, a conference centre and a restaurant. The offices are situated above the public areas from the third floor upwards and are suitable for many different types of workspace, due to the flexibility of their internal arrangement. On the third floor, there is also a laboratory in which Brussels Environment carries out trials and tests related to its work field. A prominently positioned, continuous cascade staircase dovetails with open galleries and encourages taking the stairs instead of the lift.
© cepezed | Léon van Woerkom
Section/剖面图
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
新布鲁塞尔环境部大楼获绿色评估优级并通过Passivbau(被动式建筑)认证。其建筑立面表层较小,且绝缘效果良好,一定程度上与外观三角玻璃的使用率有关。玻璃有强绝热性并结合了外部遮阳,以防在夏季被高温加热。立面上的独立通风设备同时也能阻挡夏季高温。少量机械通风和混凝土芯激活了连接地下地热泵的楼层,这也使得项目符合被动式建筑标准。中庭在安装理念中扮演重要角色,一部分是由于其收集的热能被再利用,同时也为建筑的通透性贡献卓著。建筑外表大面积的太阳能板完全融入立面之中。
The new Brussels Environment is BREEAM-Excellent and Passivbau-certified. It has a relatively small façade surface and is well-insulated, in part due to the utilization of triple glazing in a thermalbreak façade system. To protect against warming up in the summer, the glass is strongly heat-resistant and is combined with external sun shades that react to the heat load. Individual ventilation facilities in the façades also prevent excessive rises in temperature in the summer. A minimum amount of mechanical ventilation and concrete core activated floors connected to a geothermal pump in the ground also contribute to the building’s compliance with the passive building criteria. The atrium plays an important role in the installation concept, partly because the heat it captures is reused. It also makes a significant contribution to the transparency of the building. A large surface of solar panels is fully integrated in the façade.
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
© cepezed | Léon van Woerkom
Site Plan/场地平面图
Floor Plan/平面图
Floor Plan/平面图
Elevation/立面图
Section/剖面图
Detail Section/细节-剖面图
Detail/细节
Detail/细节
© cepezed | Léon van Woerkom
建筑设计:architectenbureau cepezed
地点:比利时 布鲁塞尔Havenlaan 86C
面积:19690.0 平方米
年份:2014
摄影:cepezed | Léon van Woerkom
当地建筑师:Philippe Samyn and Partners architects & engineers, 布鲁塞尔(比利时)
稳定性:Ingenieursbureau Smitwesterman, 豪达 (荷兰) /本土社群: Ingenieursbureau Meijer, 埃德海姆 (比利时)
安装工程:Flow Transfer International, 布鲁塞尔 (比利时)
建筑物理和声学:DGMR adviseurs voor bouw, industrie, verkeer, milieu en software, 阿纳姆 (荷兰)
总承包商:Van Laere NV, 兹韦恩德雷赫特(比利时)
委托人:Project T&T NV, 布鲁塞尔(比利时)
Architects: architectenbureau cepezed
Location: Havenlaan 86C, 1000 Brussel, Belgium
Area: 19690.0 sqm
Project Year: 2014
Photographs: cepezed | Léon van Woerkom
Local Party Architects: Philippe Samyn and Partners architects & engineers, Brussel (BE)
Stability: Ingenieursbureau Smitwesterman, Gouda (NL) / local party: Ingenieursbureau Meijer, Edegem (BE)
Installation Techniques: Flow Transfer International, Brussel (BE)
Construction Physics And Acoustics : DGMR adviseurs voor bouw, industrie, verkeer, milieu en software, Arnhem (NL)
General Contractor: Van Laere NV, Zwijndrecht (BE)
Client: Project T&T NV, Brussel (BE)
出处:本文译自www.archdaily.com/,转载请注明出处。
|
|