建筑师:Mario Cucinella Architects事务所
地点:意大利,米兰,皮奥尔泰洛
项目团队:Mario Cucinella, David Hirsch, Luca Bertacchi, Julissa Guttara, Michele Olivieri, Linda Larice, Luca Stramigioli
面积:11,300平方米
年份:2010
摄影:丹尼尔 多梅尼卡利
结构工程师:TIFS工程
景观:Meucci工作室
预算:15,000,000欧元
3M公司新的总部办公大楼,面积10300平方米,位于米兰郊区的皮奥尔太洛区。
该建筑开始是MC A于2005年建造的总体规划的一部分。
该线性的建筑,长105米,宽21米,整体呈从两层楼到五层楼高的梯形外形。
该建筑的外形和方向使其可以优化环境控制。东、西、北面的外墙是特殊设计的玻璃与遮阳系统。大楼南面的阶梯形成了一系列的露台,为上班族提供阴凉的户外空间。
无论冬夏,这些露台都可保护建筑物免受极端气候的影响。
该建设对周围环境的分析,使得我们采取积极的解决方案处理屋顶和外墙。
太阳能光伏设计也融入到该设计中,可提供能源,从而使建筑闪耀着熠熠生辉的技术美。
其几何构图、空间和结构线条,体现了诸如生态可持续发展和创新的原则,特别注意将建筑与环境背景相结合而采取建筑结构与采用材料和技术。
即使在建设完工前,该项目就已获得了很多的认可,如在建筑类的US Award 09。今年,在其完工后,该建设更是赢得了国际房地产投资展览会2011环保建筑大奖。
该建筑基石于2008年10月铺就,随后,其工作迅速开展起来:仅用16个月就完成了对新大楼的建造。
该建筑内部有两个开放的露天庭院,与可透视的外墙都装有特别的绝缘玻璃,可扩大采光口从而使大楼更加明亮。
草图 Diagram
场地规划图 Site Plan
特别鸣谢翻译一组10号 张晓丽 提供的翻译,译稿版权归译者所有,转载请注明出处。
The new 10,300m2 headquarters office building for the company 3M is located on the outskirts of Milan in the Pioltello district. The building is the first to be built on the site as part of a masterplan completed by MC A in 2005. A linear building, 105m long and 21m wide, it has a terraced form stepping down from five to two storeys.
The form and orientation of the building allow optimal environmental control. The north, east and west facades have specially designed glazing and shading systems. The south face of the building steps creating a series of terraces that provide shaded outdoor space for the office workers. The terraces act as an environmental buffer space that protects the building from climate extremes in both summer and winter.
Environmental analysis of the building in context led to the choice of an active solution for the roof and facades. Photovoltaics are integrated into the design and produce energy while giving a shimmering technological aesthetic to the building.
with its geometric composition, spaces and structural lines, embodies principles such as eco sustainability and innovation, standing out for the particular attention placed in blending the building structure within environmental context and use of materials and technologies. Even before the end of the building, the project obtained a lot of recognitions, like the US Award 09 in the Architecture category. This year, after it’s construction, the building won the Mipim Green Building Award 2011.
The foundation stone was placed in October 2008 and the work was carried out quickly : only 16 months for the new building to become operative.
The building has two internal open sky courtyards that, together with the see-through facades equipped with particularly insulating glasses, enhance the entrance of natural light for greater brightness.
Year: 2010
Photographs: Daniele Domenicali
Structures: TIFS Engineering
Landscape: Studio Meucci
Budget: 15,000,000€
|
|
专于设计,筑就未来
无论您身在何方;无论您作品规模大小;无论您是否已在设计等相关领域小有名气;无论您是否已成功求学、步入职业设计师队伍;只要你有想法、有创意、有能力,专筑网都愿为您提供一个展示自己的舞台
投稿邮箱:submit@iarch.cn 如何向专筑投稿?