© Kilian O’Sullivan
来自专筑编辑邱媚,vigo的报道。波兰联合会与格雷夫尼学校曾有众多合作项目,六年级区是学校教职员、学生和设计团队之间积极协作的结果。Post-BSF,波兰联合会提交了一系列为基金投资策划的潜在项目,并成功的在校后方为学院资金维修基金争取到了一个新的六年级区。项目提供了宝贵的培训教学、 研究和活动空间,为六年级学生和格雷夫尼的校园及校内建设做出积极贡献。
From the architect. UPB have worked with Graveney School on a number of projects and ventures and the Sixth Form Block is the result of a positive collaboration between the school staff, students and the design team. Post-BSF, UPB submitted a range of potential projects for funding bids, and were successful in securing an Academies Capital Maintenance Fund for a new Sixth Form Block to the rear of the school site. The building provides valuable extra teaching, study and events spaces for sixth form students, and makes a positive contribution to Graveney’s campus and host of fine architectural buildings.
© Kilian O’Sullivan
Exploded View/分解图
筹资规则意味着不得不在规定时间和预算内,以在低于现行每平方米造价指导成本交付完成项目。学校考虑购买了现成的预制模式,但对其质量有所担心。另外,项目位于 Furzedown 楼的二年级背后,意味着通用预制的建筑将难通过规划。波兰联合会的意思是在时间和成本的限制范围内提供智能化和空间新颖的替代模式。
The rules of the funding meant that the building had to be delivered on tight schedule and budget, with a target cost per sqm way below the current guidelines. The school considered buying an off-the-peg, prefabricated block, but were unconvinced about the quality of accommodation it would provide. Also, being situated behind the Grade 2 listed Furzedown House, meant that generic prefabricated buildings would be difficult to get through planning. UPBs brief was to provide an intelligent and spatially innovative alternative within the time and cost constraints.
© Kilian O’Sullivan
© Kilian O’Sullivan
© Kilian O’Sullivan
© Kilian O’Sullivan
© Kilian O’Sullivan
800平方米的项目包括 8 间教室和带阳台和走廊的双层高自主学习空间。以交叉复合木材构造和在正面开放设计窗户,能看见校区和周围的树木。
The 800sqm building includes 8 classrooms and a double-height independent study space with balconies and gallery. It is constructed from Cross Laminated Timber and has a polycarbonate front facade with window openings designed to frame views across the campus and surrounding trees.
© Kilian O’Sullivan
项目给六年级学生的创造力提供了一个启发性、激励性的学习和社交环境。在有限预算下,保证项目的建造 — — 其 CLT 框架、 面板、 外表和入口— — 与项目形状吻合,并赋予它一个强有力的、 粗犷的、现代化的身份。
The building creates an inspiring and stimulating environment for sixth form students to study and socialize in. With little budget for expensive materials or interior finishes, the tectonics and construction of the building – its CLT frame, panels, cladding and openings –are what shapes the building and gives it a strong, robust and contemporary identity.
© Kilian O’Sullivan
Sectional Perspective/断层透视图
设计的目标是争取以最小的手段达到最大的建筑产出率,是组合了毅力、 意志和野心的产物,为委托人精心打造,达到意想不到的目标。
The design aims to achieve the maximum architectural output out of minimal means, and is the product of the combined perseverance, will and ambition of the client and design team to achieve something unexpected.
© Kilian O’Sullivan
© Kilian O’Sullivan
© Kilian O’Sullivan
© Kilian O’Sullivan
© Kilian O’Sullivan
© Kilian O’Sullivan
Floor Plan/平面图
Elevation/立面图
Elevation/立面图
Section/剖面图
Detail/细节
Diagram/图解
© Kilian O’Sullivan
建筑设计:Urban Projects Bureau
地点:英国 伦敦 Tooting
面积:698.0 ㎡
年份:2014年
摄影师:Kilian O’Sullivan
结构工程:Furness Partnership
机电 顾问:Stuart McCurry & Partners Ltd
Qs:MorganCarr
协同商务合作:MorganCarr
建筑监理:Clarke Banks Limited
主要承建商:Ashe Construction
Cad 软件:Vectorworks
委托人:Graveney Trust
造价:104万英镑
Architects: Urban Projects Bureau
Location: Tooting, London SW17, UK
Area: 698.0 sqm
Year: 2014
Photographs: Kilian O’Sullivan
Structural Engineer: Furness Partnership
M&E Consultant: Stuart McCurry & Partners Ltd
Qs: MorganCarr
Cdm Coordinator: MorganCarr
Approved Building Inspector: Clarke Banks Limited
Main Contractor: Ashe Construction
Cad Software Used: Vectorworks
Client: Graveney Trust
Cost: Approx £1.04 million
出处:本文译自www.archdaily.com/,转载请注明出处。
|
|
专于设计,筑就未来
无论您身在何方;无论您作品规模大小;无论您是否已在设计等相关领域小有名气;无论您是否已成功求学、步入职业设计师队伍;只要你有想法、有创意、有能力,专筑网都愿为您提供一个展示自己的舞台
投稿邮箱:submit@iarch.cn 如何向专筑投稿?